← 返回所有职位
Operations Full-time, rotating shifts On-site, Pandeglang DC (Banten)

NOC Engineer (24/7 shift)

Staff the Network Operations Center at Dalang.io's Pandeglang facility on a 24/7 rotating shift. Monitor cluster health, respond to alerts within SLA, and execute hands-on hardware procedures from runbooks. We are hiring multiple seats to cover the rotation.

职位描述以英文呈现。您可以使用英文或印尼语提交申请。

工作职责

  • Cover assigned shifts in a 24/7 rotation — 8-hour shifts including nights, weekends, and public holidays, with shift differential.
  • Monitor the NOC surface — Grafana dashboards, alert manager, network health, fleet uptime — and acknowledge or triage alerts within the agreed SLA.
  • Execute hands-on hardware procedures from runbooks: drive swap, NIC replacement, fiber and copper cabling, PDU rebalancing, rack-and-stack of new units.
  • Escalate to the on-call SRE for issues outside runbook scope; maintain a clean incident log with timestamps and actions taken.
  • Image and provision new machines per the playbook supplied by the SRE team.
  • Maintain DC-floor cleanliness and safety; log temperature, humidity, and power readings per shift.

任职要求

  • 2+ years experience in a NOC, data center, ISP, or hosting-operations role.
  • Comfortable with rack-and-stack hardware work — fiber and copper cabling, PDU connections, hot-swap drives.
  • Linux command-line basics: log inspection, top, ip, journalctl, dmesg, smartctl.
  • Willing and able to work shift rotations including nights, weekends, and public holidays.
  • Reliable transport to / accommodation near the Pandeglang facility.
  • Bahasa Indonesia required; basic English for runbooks and incident reports.

加分项

  • BMC / IPMI / Redfish operations experience.
  • Hands-on with Incus / LXD / Proxmox or another hypervisor at the operator level.
  • Networking certifications (CCNA, MTCNA, JNCIA).
  • Experience with a ticketing system (Helpdesk, JIRA, Linear).

90 天内的成功标准

  • Independently covering shifts after the first 30 days of paired rotation.
  • Zero missed alerts attributable to procedure failure during your shifts.
  • One contribution to runbook clarity merged — corrections, additions, or edge-case documentation.

申请方式

请发送您的简历以及一段简短说明(英文或印尼语),告诉我们您会优先处理哪两项职责以及原因。我们会阅读每一份申请,并在 7 天内回复。

立即申请 → [email protected]